Renovation · Gurugram
Bathroom Renovation: Every Opening You Will Need
A room-by-room checklist of every core cutting and slab opening job a bathroom renovation typically requires, with sensible sizes and sequencing.
- Fijer Ali
- 28 January 2026
- Updated 15 February 2026
- 6 min read
A typical full bathroom renovation in a Gurugram flat or independent house needs between six and ten separate cutting jobs: supply pipe penetrations, a drain or soil pipe opening, a floor trap relocation if the layout is changing, an exhaust fan duct, sometimes a geyser pipe route, and occasionally a new window or ventilator opening in an external wall. Planning all of these together before work starts, rather than calling a cutting crew back every time the plumber finds a new requirement, is what keeps the job on schedule and on budget.
Because a bathroom concentrates more pipe and duct penetrations per square metre than any other room in the house, it is also where sizing mistakes and water damage from earlier openings show up first. This guide lists every opening a typical renovation needs, in the order they usually get cut, along with sensible sizes.
If your renovation involves changing the layout of the bathroom significantly, for instance moving the WC to the opposite wall, read this alongside our plumbing pipe openings guide which covers exact clearances for common fittings.
The typical list of openings
| Opening | Typical size | Wall/floor | Notes |
|---|---|---|---|
| Cold water supply pipe | 25-32mm core | Wall | Match to pipe OD plus 8-10mm clearance |
| Hot water/geyser supply | 25-32mm core | Wall | Consider insulation sleeve if long run |
| Drain/waste pipe | 50-110mm core | Wall or floor | Depends on fixture, WC needs largest |
| Floor trap relocation | 100-150mm core | Slab | Structural check needed near beams |
| Exhaust fan duct | 150-200mm core | External wall | Slope slightly outward for drainage |
| Geyser bracket anchors | 10-12mm drill | Wall | Not core cutting, but often done same visit |
| Ventilator/window (if new) | Custom, per frame size | External wall | Needs structural sign off, see below |
1. Supply line penetrations
Hot and cold water supply lines are the simplest openings in the job, usually a 25-32mm core through a single masonry wall. The mistake to avoid is cutting these before the plumber has finalised fitting positions, since moving a supply point after tiling starts means an ugly visible patch. We always ask for the plumber's marked layout before touching the drill, even if it delays the cutting visit by a day.
2. Drain and soil pipe openings
The soil pipe from a Western-style WC is the largest and least forgiving opening in a bathroom, typically 100-110mm depending on the fixture brand. Get this wrong on size or slope and the WC will not sit correctly, or worse, will not drain properly at all. Where the soil stack runs vertically through a slab into the floor below, this is a slab cutting job and needs the same care described in our slab cutting guide, including checking for rebar and confirming with the flat below if it is an occupied building.
3. Floor trap relocation
If the renovation moves the shower area or repositions the floor trap, this means cutting a new opening through the RCC slab and properly sealing the old one. This is one of the higher-risk cuts in the whole job because bathroom slabs sit above occupied space below, and any core through a beam-adjacent zone needs sign off per our structural approval guide. Always confirm the exact trap and pipe fitting size with the plumber before cutting, since floor traps vary meaningfully between brands.
4. Exhaust fan and ventilation duct
An exhaust duct through an external wall is usually a 150-200mm core, sized to the fan's duct collar, and should be angled very slightly downward toward the outside so condensation drains out rather than back into the fan housing. This detail gets missed often and leads to a musty smell or fan corrosion within a year. See our dedicated piece on chimney and exhaust hole cutting for the same principle applied to kitchen exhausts, which is nearly identical for bathroom fans.
5. Windows and ventilators
Adding a new window or ventilator to a bathroom, common in older independent houses in areas like Ramgarh or older DLF phases being upgraded, is a wall opening job rather than a core drilling job, usually done with a wall saw for a clean rectangular cut. This is very likely to touch a structural element on an external wall, so treat it as a structural approval item by default rather than an exception.
Sequencing the work
- 1Finalise the plumbing and fixture layout completely before any cutting starts.
- 2Cut supply and drain openings first, since these define fixture positions.
- 3Cut floor trap and slab openings next, sealing the old opening in the same visit if relocating.
- 4Cut the exhaust duct and any window opening.
- 5Complete backfilling, waterproofing and sealing around every penetration before tiling begins.
- 6Do a water test on drain lines before the tiler closes up the floor.
Doing all the cutting in one visit rather than piecemeal over several weeks is both cheaper and safer, since one crew with one setup for water and dust containment does the whole job instead of repeated smaller disruptions to a room that is already in a fragile, half-finished state.
Waterproofing after cutting
Every single penetration in a bathroom wall or floor is a potential leak path if not sealed properly, and bathrooms are the room where this matters most because water exposure is constant rather than occasional. Backfill around pipes with a proper non-shrink grout or expanding sealant rated for wet areas, and apply waterproofing membrane over floor penetrations before the final screed and tiling go down. Our post-cut repair and finishing guide covers this in detail, and our monsoon waterproofing guide is worth reading if your renovation timeline runs into the rainy season.
A bathroom renovation is judged two years later by whether the ceiling below stays dry, not by how the tiles look on handover day.
Typical costs to budget for
For a standard bathroom, the full set of pipe, drain and exhaust openings typically falls in the range of ₹4,000 to ₹12,000 depending on wall thickness, number of penetrations and whether slab cutting for a floor trap relocation is involved, a typical range, confirm on quote after a site visit. Adding a new window or ventilator with structural sign off adds meaningfully to both cost and timeline, so factor that in early if it is part of the plan.
Plan the whole bathroom in one visit
If you are renovating a bathroom anywhere in Gurugram, from DLF Phase 2 to newer sectors past Sohna Road, it is worth having one crew assess every opening the job needs at once rather than calling separately for each fixture. Contact us with your plumbing layout and we will scope the full list of cuts, sizes and sequencing before your renovation timeline is locked in.
Frequently asked questions
- How many cutting jobs does a typical bathroom renovation need?
- Most full bathroom renovations need between six and ten separate openings, covering supply lines, drain and soil pipe, floor trap if relocating, exhaust duct, and occasionally a window or ventilator.
- What size hole does a WC soil pipe need?
- Typically 100-110mm depending on the fixture brand and pipe fitting, but always confirm the exact outer diameter with the plumber before cutting since sizes vary between manufacturers.
- Does relocating a floor trap always need structural approval?
- Not always, but any slab opening near a beam or column should be checked by a structural engineer first, since bathroom floor slabs sit directly above occupied space in most buildings.
- Should the exhaust fan duct be angled?
- Yes, a slight downward slope toward the outside helps condensation drain away from the fan rather than back into the housing, which extends the fan's life and reduces musty smells.
- Can all the bathroom cutting be done in one visit?
- Yes, and it is usually cheaper and less disruptive to plan the full plumbing and exhaust layout in advance and complete every opening in a single visit rather than calling the crew back multiple times.
- What happens if a pipe opening is not waterproofed properly?
- Unsealed penetrations are one of the most common causes of leaks into the ceiling below, since bathrooms have near-constant water exposure. Proper backfilling and membrane sealing around every penetration is essential before tiling.
Next step
Planning a bathroom renovation?
Send us your plumbing layout and we will scope every opening your bathroom needs in one visit.
Related guides

Guides
Plumbing Pipe Openings: Sizes, Slope and Waterproofing
Plumbing pipe openings need the right clearance, the correct fall for drain lines and careful waterproofing, not just a hole matching pipe diameter.

Renovation
Kitchen Chimney Installation: Getting the Hole Right
The correct size, position and slope for a kitchen chimney exhaust hole, and the mistakes that cause smoke to leak or grease to drip back inside.

Renovation
After the Cut: Repair, Sealing and Finishing Openings
Sealing core cut holes properly, with the right sleeve, grout and waterproofing, matters as much as the cutting itself, especially for external and wet-area penetrations.