Large concrete construction site in Gurugram at golden hour

Selected work · Gurugram

Cuts from aroundthe city.

Homes, towers, kitchens and basements — a look at openings we have cut across Gurugram and what each job needed.

4000+

Openings delivered

9 sectors

Regular coverage

Night shifts

For live buildings

Zero

Structural claims

Gallery

Finished openings, photographed on site.

Every image below is our own work — no stock renders, no borrowed portfolios.

Core rig drilling on an occupied floor
Core drill

Core rig drilling on an occupied floor

Gurugram

Twin duct holes through a finished ceiling
AC holes

Twin duct holes through a finished ceiling

Sector 57

On site video

Core cutting in action

Ramgarh

Wall opening for a new doorway
Wall saw

Wall opening for a new doorway

Sector 67

Slab duct grid for HVAC risers
Slab cutting

Slab duct grid for HVAC risers

DLF Phase 3

Pre-cut survey and rebar scan
Survey

Pre-cut survey and rebar scan

M3M Urbana

Reinforced column penetration
Concrete cutting

Reinforced column penetration

Sohna Road

Plumbing risers through a basement slab
Plumbing openings

Plumbing risers through a basement slab

Sector 82

Kitchen chimney duct opening
Chimney & exhaust

Kitchen chimney duct opening

Sushant Lok

Case notes

Three jobs, start to finish.

Basement plumbing risers, Sector 82

Slab cutting

Basement plumbing risers, Sector 82

Eleven penetrations through a 300 mm reinforced basement slab for a tower plumbing retrofit.

Outcome

Set out from the plumbing drawing, scanned for rebar, cut and sleeved in a single night shift.

New doorway opening, Sector 67

Wall saw

New doorway opening, Sector 67

A 900 × 2100 mm doorway cut into a load-bearing concrete wall inside an occupied apartment.

Outcome

Vibration-free sawing with full sheeting — no cracking to adjoining tiling or paint.

HVAC duct grid, DLF Phase 3

AC & duct

HVAC duct grid, DLF Phase 3

A grid of 26 slab openings for a commercial fit-out with a tight ceiling coordination window.

Outcome

Delivered across two days with cores removed and the ceiling void left clear for the ductwork crew.

Next project

Your site could be next.

Send the drawing or a photo of the wall and we will scope the openings, the method and the price.

Start a request